The Assay Office and What It Does
In the United Kingdom, any item of precious metal sold as such must carry a hallmark — a cluster of punched symbols recording the metal, its fineness, and the office that tested it. The four UK assay offices still operating are in London, Birmingham, Edinburgh and Sheffield, each with its own town mark: the leopard's head, the anchor, the castle, the rose. A ring leaves the maker's bench, travels to whichever office the maker uses, is tested and stamped, and comes back. That round trip takes time, and the maker plans around it.

The assay itself is either touchstone testing for low-value work or, more commonly now, X-ray fluorescence — a non-destructive technique that reads the alloy's composition without removing material. Once the office is satisfied, it strikes the marks using hardened dies. On a narrow ring shank, that strike has to be placed precisely; a misaligned punch damages the work. Some offices offer laser marking for items too delicate to stamp cold.
The marks tell a compressed story. The maker's registered sponsor's mark — two or more letters in a shaped cartouche — identifies who made the piece. The metal and fineness mark gives the alloy: 750 for 18-carat gold (seventy-five parts per thousand pure gold), 950 for platinum, 925 for sterling silver. The assay office mark names who tested it. An optional date letter records the year, though it is no longer compulsory in the UK following changes in 1999.
Hallmarking law is not unique to Britain — France, Austria, the Nordic countries and others each run their own systems, with varying conventions and thresholds. The Convention on the Control and Marking of Articles of Precious Metals, the so-called Vienna Convention, allows a common control mark to substitute for national marks among member states, which simplifies cross-border trade for jewellers working internationally.

For the maker, the bureaucratic reality is this: a ring is not finished until it comes back from assay. If a customer wants a ring in three weeks, the maker counts backwards — fabrication time, assay turnaround, any final polishing that has to happen after stamping because the strike raises a slight burr. Rush assay services exist, and the Birmingham office in particular has long handled high volumes quickly, but even an expedited submission takes days. A commission that runs late on the bench can run out of time entirely before the date it is needed, and no amount of skill at the bench recovers a lost week at the assay office.
